DVGW G 469 PDF

Technical Rule – Code of Practice. DVGW G (A) |June Pressure testing methods for gas transmission/gas distribution. DVGW G – DVGW G Polyethylen gas pipelines with an operating pressure up to and including 10 bar (PE 80, PE and PE-Xa) -. Technical rule [WITHDRAWN] Article is not orderable. DVGW G Compression strength test for pipelines and facilities of gas supply.

Author: Mausida Taular
Country: Tanzania
Language: English (Spanish)
Genre: Travel
Published (Last): 28 November 2017
Pages: 379
PDF File Size: 16.44 Mb
ePub File Size: 12.62 Mb
ISBN: 656-9-55868-375-9
Downloads: 65137
Price: Free* [*Free Regsitration Required]
Uploader: Goltir

This applies in h to pipelines with mechanical socket connections. The water loss method see DVGW Worksheet W can be used as an equivalent alternative to the pressure loss method described above. Before starting the test, the pipeline must be slowly and evenly filled with water at a rate of about 0.

Hydrostatic testing — CEPS a.s.

The pressure loss may amount to:. The test sections must be defined so that:. Pressure tests must be carried out by qualified personnel with the relevant knowledge of pipeline engineering, the execution of pressure tests, the measurement techniques and the applicable safety regulations. Carry out as specified by dvwg planner Main test: To stabilize the pipeline section when the soil has finally settled and the cement-mortar lining has absorbed sufficient water.

  A TEXAN LOOKS AT LYNDON BY J.EVETTS HALEY PDF

Pressure test

Water absorption in the cement-mortar pores may initially cause a drop in pressure even if the pipeline is completely watertight. The pressure must be brought back to the test level at regular intervals and in any case after a dvtw of 0. The joints need not be covered by backfill.

There are two basic test methods: Before the pressure test can be carried out, the pipeline must be covered with backfill material so as to avoid shifts in position, which could cause leaks. Each pipeline must be subjected to a dvyw test after it has been laid.

Drucken Teilen Xing Twitter. It is carried out over a period of 3 hours for pipes up to DN Determines the amount of air still in the pipeline.

The pipeline is to be tested over its entire length or, if necessary, in sections. The test sections must be defined so that: The main test is a test of the entire system, and in particular of the watertightness and proper execution and installation of the pipes, fittings, dvvw. The pressure test is carried out in a maximum of three steps.

  ASAHI PENTAX SPOTMATIC MANUAL PDF

The pressure loss may amount to: For this reason it is advisable to carry out the pressure test over a period of at least 24 hours. The pressure test must be carried out in compliance with the requirements laid down in the relevant rules and regulations, e.