Control of Groundwater for Temporary Works: C (CIRIA Report). by S.H. Somerville. Book condition: Used – Good. Book Description. Construction Industry . Buy Groundwater Control – Design and Practice (CIRIA Report) by M. Preene, T. O. L. Roberts, William Powrie, M. R. Dyer (ISBN: ) from. and groundwater control and is the author of the UK industry guidance on dewatering (CIRIA Report C Groundwater Control Design and.
Author: | Mirr Brajin |
Country: | Guinea |
Language: | English (Spanish) |
Genre: | Politics |
Published (Last): | 23 February 2018 |
Pages: | 147 |
PDF File Size: | 6.83 Mb |
ePub File Size: | 4.17 Mb |
ISBN: | 405-9-78944-189-6 |
Downloads: | 24845 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Shalrajas |
Preene Groundwater Consulting My experience includes the design of: Send a message Share.
Based on research project RP This document Newer versions. I have worked for contractors and consultants on engineering and mining projects worldwide.
Control of Groundwater for Temporary Works: C515 (CIRIA Report)
The Amber document status indicator indicates that some caution is needed when using this document – it is either: I work as an independent consultant in the design of dewatering and groundwater control systems through my professional practice: Martin Preene Principal Preene Groundwater Consulting Wakefield Yorkshire United Kingdom I am an independent consultant specialising in dewatering, groundwater control and groundwater engineering.
I have wide professional interests in hydrogeology and am the author of one textbook, more than 50 papers, and several industry guidance documents on dewatering and groundwater control.
I also have experience in: Document Status Indicators The Green document status indicator indicates that the document is: Again there may be more recent versions of the document.
PUB C Groundwater control – design and practice. Principal Preene Groundwater Consulting Wakefield Yorkshire United Kingdom I am an independent consultant specialising in dewatering, groundwater control and groundwater engineering. I have expertise in the design and construction of groundwater control by pumping such as well points, deep wells, etc and of cut-off walls to exclude groundwater.
Want access to British Standards? Home Featured Authors Martin Preene. Free to use BIM project management tool provides step-by-step help to define, manage and validate responsibility for information development and delivery at each stage of the asset life cycle in level 2 BIM projects.
Provides information and guidance on pumping methods used to control ground water as part of the temporary works for construction projects. The Red document status indicator indicates that the document is an old version The document has likely been withdrawn by the publisher, also the meta data presented here may be out of date as it re;ort no v515 being maintained by the editorial teams at NBS.
Control of Groundwater for Temporary Works: C (CIRIA Report) by S.H. Somerville
They are a member-based research and information organisation who publish reports and technical papers covering building and civil engineering as well as transport and utilities infrastructure.
Subjects Engineering – Civil. Aug 13, Groundwater Lowering in Construction: